- Home
- >
- Tender
- >
- Gujarat Tender
- >
- Department of NARMADA WATER RESOURCES
- >
NTID 42724518
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowItem unit Rate For The Compo in Surendranagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Item unit Rate For The Compo" in Surendranagar, India.
NARMADA WATER RESOURCES
Surendranagar, Gujarat, India
NTID 42724518
- Opening Date : Refer Documents
- Closing Date : Wed 26th November, 2025
- ₹ 0.00
- NTID 42724518
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
1500.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 30 | Total Qty : 30
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in all sort of strata and formations incl. depositing the unuseful excavated stuff as and where directed incl sorting and stacking useful materials as directed upto 30 mt lead etc. complete incl. dewatering. (Depth 0 to 3.0 mt ) (For all type canal & foundation trenches of C.D. works )(A) IN OVERBURDEN INCL. HARD MURRUM. | 1.000 | Cum |
| 2 | Excavation in all sort of strata and formations incl. depositing the unuseful excavated stuff as and where directed incl sorting and stacking useful materials as directed upto 30 mt lead etc. complete incl. dewatering. (Depth 0 to 3.0 mt ) (For all type canal & foundation trenches of C.D. works )(B) IN SOFT ROCK. | 1.000 | Cum |
| 3 | Excavation in all sort of strata and formations incl. depositing the unuseful excavated stuff as and where directed incl sorting and stacking useful materials as directed upto 30 mt lead etc. complete incl. dewatering. (Depth 0 to 3.0 mt ) (For all type canal & foundation trenches of C.D. works )(C )IN HARD ROCK. | 1.000 | Cum |
| 4 | Dewatering of foundation area, pits & trenches of head works and allied works with diesel or electrical pumping arrangement incl cost of pipe lines, others materials ,labours etc complete as directed with all lifts. | 1.000 | Hp/hr |
| 5 | Earthwork in embankment using excavated stuff including spreading in uniform layers breaking clods and dressing to design section for all sorts of soil and soft murrum hard murrum for different leads as under and all lifts above GL etc complete but without rolling & watering.a) lead upto 200 mt | 1.000 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054