- Home
- >
- Tender
- >
- Madhya Pradesh Tender
- >
- Department of Madhya Pradesh Power Management Company Limited
- >
NTID 42847555
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowInstallation Of Height Barrier in Jabalpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Installation Of Height Barrier" in Jabalpur, India.
Madhya Pradesh Power Management Company Limited
Jabalpur, Madhya Pradesh, India
NTID 42847555
- Opening Date : Wed 3rd December, 2025
- Closing Date : Mon 1st December, 2025
- ₹ 375000.00
- NTID 42847555
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 8 | Total Qty : 3347
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Structural steel work built up sections: Structural steel work using M.S. flats, angles, channels I-section, H-section etc. riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2400.00 | Kg |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) Including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) All kinds of soil. | 20.00 | Cum |
| 3 | Centering and Shuttering: Centering and shuttering in cluding strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for concrete upto plinth level. | 50.00 | Sqm |
| 4 | Steel Reinforcement : Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire all wastages and overlaps, couplers (overlaps shall be provided as per requirement of IS 13920 for ductile detalingIS 456 RCC Design & SP 34 Reinforcement detailing ) etc. complete .(Note: - 1. Spacer bars (chairs) shall be paid separately as shown in the drawing and as per direction of engineer in charge. 2. No extra payment shall be done for overlaps and/or couplers. 3.Couplers shall be conforming to IS code on Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification ) Mild steel and Medium Tensile steel bars. | 750.00 | Kg |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level :With 20mm nominal size graded stone aggregate.M-10Nominal (Mix-1 Cement : 3 sand : 6 graded stone aggregate ) | 2.00 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054