- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
- >
NTID 43693554
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowImprovement Works By Providing in Erode - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Improvement Works By Providing" in Erode, India.
TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
Erode, Tamil Nadu, India
NTID 43693554
- Opening Date : Tue 10th February, 2026
- Closing Date : Tue 10th February, 2026
- ₹ 614200.00
- NTID 43693554
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
6200.00 -
Document Cost
Refer Documents -
Estimated Cost
614200.00
BOQ Items Total Items : 32 | Total Qty : 987.07
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling the existing damaged Thermacoal false ceiling with the grid arrangements including frames and grills and stacking all the materials carefull as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete. | 55.00 | M2 |
| 2 | Dismantling the existing window Shutters make necessary repairs to the same, replacing the necessary hinges, handles, etc., and re erection of the window shutter and frames as directed by the Enginner in charge at site including cost of all materials such as Window hinges, Screws, labours, lead, lift, etc., complete. | 2.75 | M2 |
| 3 | Dismantling of existing Doors including removal Frames, hinges and fastenings etc., including all labour charges, lead, lift, T&Ps etc., complete. | 4.20 | M2 |
| 4 | Earth work excavating and depositing on banks with initial lead of 10m and initial lift of 2m in Hard stiffy clay, hard red earth, shales, muram etc., as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete. | 0.15 | M3 |
| 5 | Providing P.C.C. 1:4:8 using 40mm HBG metal for foundation and Basement as directed by the Engineer in charge including cost of all materials, labour charges, curing, T&P, lead, lift etc., complete. | 0.05 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054