Inquiry NowImprovement To Madhujhari Mip in phulbani - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Improvement To Madhujhari Mip " in phulbani, India.
- Opening Date : Tue 30th December, 2025
- Closing Date : Mon 29th December, 2025
- ₹ 15179000.00
- NTID 43233241
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
151800.00 -
Document Cost
10000.00 -
Estimated Cost
15179000.00
BOQ Items Total Items : 25 | Total Qty : 149091.96
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing shrub jungles including uprooting stumps and small bushes and trees below 1m. girth based on pre-measurement including clearing the debris and depositing the same clear of work site with all leads & lifts including supply of all labour etc. complete in all respect as directed by the Engineer in charge. | 85796.500 | Sqm |
| 2 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. inter-spread with boulders up to cum. Size with all lifts and de-lifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge with all leads from the place of excavation complete in all respect as directed by the Engineer in charge. (Foundation) | 39841.950 | cum |
| 3 | Removing and Clearing of deposited earth and silt with all leads and lifts (ordinary soil) to proper slope and profile as per the requirement including rough dressing and breaking clods to a maximum 5 to 7 cm and laying in layers not exceeding 0.23 m in depth in proper slope and profile along with supply of all labour and tools & plants, all materials including all taxes & supervision charges to complete the item of work as per design, drawing and specification and as per the direction of the Engineer-in-charge. (Measurement will be taken in the finished approved level section) | 2527.880 | cum |
| 4 | Earth work in excavation in hard soil with all leads, lifts, and delifts to proper profile and required depth of cutting and depositing the excavated earth to proper embankment profile with all leads lifts and delifts including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.30M in depth and depositing the balance soil if any clear of work with all leads lifts and delifts etc.complete as directed by the Engineer-in-charge. (Measurement will be taken on the finished approved level section.1/6 th volume to be deducted towards settlement) | 1671.780 | cum |
| 5 | Excavation of foundation to proper profile in hard & gravelly soil including moorum, stoney earth, gravel etc. except all kinds of rock & boulders exceeding 0.014 cum in volume with all leads, lifts and delifts, including dressing and leveling the bed to proper slope and level making it fit for laying concrete and depositing the excavated materials clear of work site with all leads and lifts etc. including dewatering from foundation if necessary etc. with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge. (Measurement will be taken on finished approved level section). | 1777.840 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.