- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of Odisha Tourism Devl. Corp.
- >
NTID 46581457
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowImprovement Of Kardola Craft V in Sambalpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Improvement Of Kardola Craft V" in Sambalpur, India.
- Opening Date : Sat 19th September, 2026
- Closing Date : Fri 18th September, 2026
- ₹ 45097784.00
- NTID 46581457
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
450980.00 -
Document Cost
10000.00 -
Estimated Cost
45097784.00
BOQ Items Total Items : 182 | Total Qty : 83259.22
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Façade | ||
| 2 | Dismantling brick or stone masonry in cement mortar under 3m height including stacking the useful materials for reuse and removing the debris within 50m lead including cost of all material, labour, conveyance, loading and un-loading, royalties, sundries, tools and plants, etc., complete as per the direction of the Engineering-in-charge/Consultant. | 77.52 | CUM |
| 3 | Dismantalling and removal of old RCC from beam, column, roof slab,self, chajja etc including stacking of servicable material and removal of debries to an unobjectionable area within 50 mtr lead etc. complete with cost, conveyance, loading and unloading, royalties of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge | 44.37 | CUM |
| 4 | Dismantalling and removal of old plain cement concrete from foundation, floor etc including stacking of servicable material and removal of debries to an unobjectionable area within 50 mtr lead etc. complete with cost, conveyance, loading and unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge | 91.8 | CUM |
| 5 | Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead etc. complete with cost, conveyance, loading and unloading, royalties of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge | 238.68 | SQM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054