- Home
- >
- Tender
- >
- Tripura Tender
- >
- Department of Tripura State Electricity Corporation Limited
- >
NTID 43769926
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowImprovement Of Approach Area I in Agartala - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Improvement Of Approach Area I" in Agartala, India.
- Opening Date : Fri 13th February, 2026
- Closing Date : Fri 13th February, 2026
- ₹ 1021843.00
- NTID 43769926
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20437.00 -
Document Cost
590.00 -
Estimated Cost
1021843.00
BOQ Items Total Items : 14 | Total Qty : 1651.66
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Heading 1 | ||
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.All kinds of soil | 251.55 | Sqm |
| 3 | Earth Work in excavation by mechanical means (Hydraulic excavator / manual means over areas exceeding 30 cm in depth , 1.5 meter. In width as well as 10 sqm on plan) including disposal of excavated earth , lead upto 50 mtr. And lift upto 1.5 mtr. Disposed earth to be leveled and neatly dressed All kinds of soil | 25.16 | cum |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out thje excavated soil and disposal of surplus excavated soil as directed , within alead of 50m . all kinds of soil | 6.58 | cum |
| 5 | Banking excavated earth in layers not exceeding 20 cm in depth , breaking clods , watering , rolling each layers with tone roller or wooden or steel rammers and rolling every 3rd and top most layer with power roller of minimum 8 tones and dressing up in embankments for roads , flood banks, marginal banks and guide banks etrc. Lead up to 50 mtr. and lift upto 1.5 m.All kind of soil | 74.00 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054