Inquiry Nowi Impt Of Road With Earth F in Barpeta - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for " i Impt Of Road With Earth F" in Barpeta, India.
- Opening Date : Wed 15th July, 2026
- Closing Date : Wed 15th July, 2026
- ₹ 12019740.00
- NTID 45675603
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
240400.00 -
Document Cost
2500.00 -
Estimated Cost
12019740.00
BOQ Items Total Items : 36 | Total Qty : 20229.044
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | (i) Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,shrubs,saplings and trees of girth upto 300 mm dia, removal of stumps of trees cut earlier and disposal of serviceable materials to be used or auctioned, upto 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specifications clause 201 A) In area of non thorny jungle | 1.170 | Hect |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead up to 1000 m as per Technical Specification Clause 301.5 i) Private land | 6039.820 | Cum |
| 3 | Construction of sub-grade and earthen shoulders with approved materials obtained from borrow pits with all lifts and leads transporting to site, spreading, grading to required slpoe and compacting to meet required of Table 300.2 with lead upto 1000m as per technical specification clause. (i) Private Land | 722.675 | Cum |
| 4 | Granular sub base/base surface course with local materials (table 400.13) by mix in place method normal constructionn of granular sub baseby prooviding local material spreading in uniform layers with motor grader on prepared surface, mxing by mix in place mehod with rotavator at once and compacting with smooth wheel roller to achieve the desired ensity complete as per clause 401.4 as per technical speccifications clause 408. i) Using naturally occuring gravel | 1094.963 | Cum |
| 5 | CD Work: RCC Slab Culvert 2.00m Span at Ch.1200.00m 1 No. Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil | 69.000 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054