- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of INDIRA GANDHI CENTRE FOR ATOMIC RESEARCH
- >
NTID 44646318
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowHorticulture Maintenance And O in Kanchipuram - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Horticulture Maintenance And O" in Kanchipuram, India.
INDIRA GANDHI CENTRE FOR ATOMIC RESEARCH
Kanchipuram, Tamil Nadu, India
NTID 44646318
- Opening Date : Thu 9th April, 2026
- Closing Date : Wed 8th April, 2026
- ₹ 1710000.00
- NTID 44646318
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
34200.00 -
Document Cost
Refer Documents -
Estimated Cost
1710000.00
BOQ Items Total Items : 22 | Total Qty : 154150
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork excavation by manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-Charge. | ||
| 2 | All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres. | 5 | Cu.m. |
| 3 | Collection, supplying and stacking good quality Red earth without stones, gravel etc., and stacking for premeasurement at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pits etc., complete all as per specification and as directed by the Engineer-in-Charge. | 140 | Cu.m. |
| 4 | Maintenance of lawns, flower beds, hedges, trees etc., in garden area (Non- sprinklers area) by watering at regular intervals, cutting and trimming hedges, and the unwanted growth of grasses as and when required including running lawn mover, removing weeds, collecting the cut grass, fallen leaves of trees and disposing the same at dumping yards shown by the department, watering the trees inside the garden area complete all as per specifications and as directed by the Engineer-in-charge. Note: 1. The rate shall include the cost of hire charges of lorry and labour for transporting of cut grass, leaves etc., to the dumping yard. 2. The rate shall also include cost of all tools, plants, water delivery hose required for gardening etc. 3. The rate quoted shall be per Sq.m. area maintained per month. 4. Contractor has to make his own arrangement for Lawn Movers. If departmental lawn movers is available it will be provided by department on chargeable basis. 5. If lawn mover is not used, then recovery at the rate as mentioned in specification will be levied as penalty from RA Bill. 6. The contractor shall engage minimum 1 person for 1500 sq. m /day throughout the month as directed by Engineer-in-charge. Failure to employ the above minimum numbers of labour will attract penal clause as per additional special condition of contract attached with the tender for every default of labour. 7. Cutting plants should be handed over to department for sampling by the contractor as directed by the Engineer-in-charge. 8. The contractor shall supply the PPE to the garden labour and they should wear the PPE during their working hours. | 18150 | Sq.m. |
| 5 | Supply and spreading of Fertilizer (urea), neem cake including cost of fertilizer and neem cake etc., all as per specification for Orchard plants / trees at the rate of 0.01kg/Sqm for fertilizer and 0.005kg/Sqm of neem cake, all as directed by the Engineer-in-Charge. | 4960 | Sq.m. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054