NTID 46407776
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowHiring Of Contracts For Ground in Bangalore - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Hiring Of Contracts For Ground" in Bangalore, India.
- Opening Date : Thu 10th September, 2026
- Closing Date : Wed 9th September, 2026
- ₹ 0.00
- NTID 46407776
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
900000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 20 | Total Qty : 4808
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | The scope under the proposed tender is covering the Ground Connectivity works for Domestic/Commercial/Industrial customers for GAIL Gas Bengaluru CGD Project. Handling, Receipt, Loading, unloading, storing, reloading, transportation, Uncoiling, laying of PE100, SDR11 line pipes of all sizes (Free Issue Material from Owner's designated store within GA) including, proper stacking, and supply of accessories of all sizes & thickness like PE Bends, Saddle, Couplers, Endcaps, Tee(Equal/ Reducing), Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), (excluding asphalt road crossing width from road edge to road edge covered separately under item C1) in case road crossing is required for connectivity) laying /installation of PE pipe in any method (Open Trench/Moling/rat-boring/ auger method, etc. including execution of all associated works/consumables etc. for Ground Connectivity works from charged MDPE pipeline to customer premise. Carrying out preliminary & final survey activities for crossings encountered in pipeline route and preparation of drawings with crossing methodology etc. wherever required and submission of drawings to Owner/Engineer-in-charge for review / approval. Getting approval/permissions /clearances for execution from concerned authorities, utility operators, etc, Dismantling/demolition/Rock breaking of RCC/ PCC/ Paver Blocks/ Footpath/Asphalt/Bitumen, all types of soils including soft/ rocky strata / roads etc., chiselling or otherwise cutting etc. as required and storing excavated soil etc. for pit excavation, Excavation of the soil, to determine the underground utilities/ services, charged pipelines, etc., Barricading the work area, restoration of the excavated portion to original condition and final clean up, to entire satisfaction of Owner/Engineer-in-charge and/or concerned authority as per the typical restoration drawing. The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD - 226 & PNGRB latest guidelines whichever is higher. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation Laying of PE pipelines with associated fitting, jointing of the pipe ends / fittings using approved electro-fusion techniques | ||
| 2 | Padding around pipeline with soft soil, backfilling to its original condition with excavated earth / borrowed select soil/sand & its compaction & crowning & restoration as per the attached drawing and shall be made ready for motorable. All tiles/slabs/curb stones etc removed during excavation shall be placed properly. The scope of work against laying of 20/32/63/90 mm pipe, online tapping with saddle/tee with the existing charged pipeline. In case, the minimum required depth is not possible due to site condition, necessary mitigation measures shall be required to be taken by contractor in consultation with EIC Flushing, Pneumatic testing and commissioning, providing all tools and tackles, instruments, manpower and other related accessories. On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements. On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements, reconciliation of material. | ||
| 3 | Dismantling/demolition/ breaking | ||
| 4 | Dismantling/demolition/ breaking of RCC /Hard Rock | 100 | M3 |
| 5 | Dismantling/demolition/ breaking of PCC | 67 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054