- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Director Cum Chief Engineer RED
- >
NTID 43236122
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowGram Panchayat Kudaspara Ke Co in Bahraich - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Gram Panchayat Kudaspara Ke Co" in Bahraich, India.
Director Cum Chief Engineer RED
Bahraich, Uttar Pradesh, India
NTID 43236122
- Opening Date : Mon 29th December, 2025
- Closing Date : Mon 29th December, 2025
- ₹ 289000.00
- NTID 43236122
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 25 | Total Qty : 667.2218
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | E/W in excavation in trenches for foundation & for pipes cables etc.in Ordanry soil (loam cly or sand) including filling lift upto 1.5m. And lead upto 30m. Excavated erth into the tranches or plinth and dressing of sides & ramming bottoms watering and ramming & disposal of suuplus excavated earth as directed by the engineer I/C SI No. 251 | 6.98 | Cum |
| 2 | Providing and laying in cement concrete 1:6:12 (1Cement:4 Fine sand of 1.25FM:8graded brick aggregate 40 mm. Nominal size) curring complete. Including cost of work. As per SI No273. | 1.13 | Cum |
| 3 | M-150 class brick work in 1:4 cement and fine sand 2.25 fineness modlus includingh supply of all material. Labours and tools and plants etc. requires for proper completion of the work SI. No. 305(B) | 2.73 | Cum |
| 4 | 12mm thick in 1:3 cement and c/Sand Below plinth /bearing and roof plaster including material SI No.583 | 5.79 | Sqm |
| 5 | Providing and laying Cement concrete 1:2:4 (1 cement: 2 coarse sand 4 graded stone ballast 20 mm. nominal size) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors.as per SI No.279(b) | 1.16 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054