- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Director Cum Chief Engineer RED
- >
NTID 43236123
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowGram Panchayat Khajuri Me Sri in Bahraich - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Gram Panchayat Khajuri Me Sri " in Bahraich, India.
Director Cum Chief Engineer RED
Bahraich, Uttar Pradesh, India
NTID 43236123
- Opening Date : Mon 29th December, 2025
- Closing Date : Mon 29th December, 2025
- ₹ 289000.00
- NTID 43236123
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 25 | Total Qty : 667.2218
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | E/W in excavation in trenches for foundation & for pipes cables etc.in Ordanry soil (loam cly or sand) including filling lift upto 1.5m. And lead upto 30m. Excavated erth into the tranches or plinth and dressing of sides & ramming bottoms watering and ramming & disposal of suuplus excavated earth as directed by the engineer I/C SI No. 251 | 6.98 | Cum |
| 2 | Providing and laying in cement concrete 1:6:12 (1Cement:4 Fine sand of 1.25FM:8graded brick aggregate 40 mm. Nominal size) curring complete. Including cost of work. As per SI No273. | 1.13 | Cum |
| 3 | M-150 class brick work in 1:4 cement and fine sand 2.25 fineness modlus includingh supply of all material. Labours and tools and plants etc. requires for proper completion of the work SI. No. 305(B) | 2.73 | Cum |
| 4 | 12mm thick in 1:3 cement and c/Sand Below plinth /bearing and roof plaster including material SI No.583 | 5.79 | Sqm |
| 5 | Providing and laying Cement concrete 1:2:4 (1 cement: 2 coarse sand 4 graded stone ballast 20 mm. nominal size) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors.as per SI No.279(b) | 1.16 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054