- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Director Cum Chief Engineer RED
- >
NTID 43864926
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowGram Kurahua Vikash Khand Araj in Varanasi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Gram Kurahua Vikash Khand Araj" in Varanasi, India.
Director Cum Chief Engineer RED
Varanasi, Uttar Pradesh, India
NTID 43864926
- Opening Date : Sat 28th February, 2026
- Closing Date : Sat 28th February, 2026
- ₹ 1261000.00
- NTID 43864926
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
25220.00 -
Document Cost
766.00 -
Estimated Cost
1261000.00
BOQ Items Total Items : 13 | Total Qty : 1112.398
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam clay or Sand) i/c lift upto 1.5 m and lead upton30m and i/c filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer Incharge up to a distance of 30 m. from the foundation trenches including all T&P, phowarah and basket etc. complete.S.I.NO-251 | 137.600 | Cum. |
| 2 | Concrete with 4cm. Gauge brick ballast, sand of 1.25 F.M. and cement in proportion of 12:6:1 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work S.I. No-273 | 11.200 | Cum. |
| 3 | CEMENT Concrete with 4 cm guage brick ballast Coarse sand of 2:25 PM and cement in proportion of 1:4:8 in foundation and under floor including supply of all materials labour T&P etc. required for proper completion of the work SI No. 281 | 11.536 | Cum. |
| 4 | M-150 brick work in 1:4 Cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work.S.I. No-305 | 39.910 | Cum. |
| 5 | 12 mm thick plaster in 1:4 cement and fine sand mortar as per SI No 584 | 132.480 | Sqm. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054