- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of LUCKNOW DEVELOPMENT AUTHORITY
- >
NTID 44490684
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowGomti Nagar Yojna Vikalp Khan in Lucknow - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Gomti Nagar Yojna Vikalp Khan" in Lucknow, India.
LUCKNOW DEVELOPMENT AUTHORITY
Lucknow, Uttar Pradesh, India
NTID 44490684
- Opening Date : Tue 24th March, 2026
- Closing Date : Mon 23rd March, 2026
- ₹ 5920189.00
- NTID 44490684
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
296000.00 -
Document Cost
2950.00 -
Estimated Cost
5920189.00
BOQ Items Total Items : 5 | Total Qty : 50019.2
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | 12 mm cement plaster of mix :, 1:4 (1 cement: 4 coarse sand)DSR 2023- 13.4.1 | 1411.200 | Sqm |
| 2 | Finishing walls with textured exterior paint of required shade :, Old work (Two or more coats on existing cement paint surface applied @ 3.28 ltr/10 sqm.DSR 2023- 13.110.1 | 14112.000 | Sqm |
| 3 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.DSR 2023- 13.80 | 14112.000 | Sqm |
| 4 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. completeDSR 2023- 13.88 | 14112.000 | Sqm |
| 5 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspectionof work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment shall be made once irrespective of duration of scaffolding.Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done.DSR 2023- 14.72 | 6272.000 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054