Inquiry NowGeotechnical Investigation And in Panvel - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Geotechnical Investigation And" in Panvel, India.
Directorate of Construction Services and Estate Management
Panvel, Maharashtra, India
NTID 46403560
- Opening Date : Fri 18th September, 2026
- Closing Date : Wed 16th September, 2026
- ₹ 925000.00
- NTID 46403560
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
18500.00 -
Document Cost
Refer Documents -
Estimated Cost
925000.00
BOQ Items Total Items : 48 | Total Qty : 421.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork excavation in foundation pits, trenches, misc. works, etc. in all soils other than soft and hard rock upto depths mentioned below including shoring and dewatering, if necessary, trimming, ramming and preparing the bed for foundation and refilling around foundation and in plinth with selected excavated earth, in layers not exceeding 150mm thick, watering, consolidation to obtain 90% proctor density and disposing of the surplus earth within a distance of 300m, etc. complete as per specifications, drawings and as directed by the Engineer-in-charge. | ||
| 2 | a) Depth not exceeding 1.5m from Ground level | 20 | cum |
| 3 | b) Depth exceeding 1.5m and up to 3.0m from Ground level | 20 | cum |
| 4 | c) Depth exceeding 3.0m and up to 4.5m from Ground level | 7 | cum |
| 5 | Earthwork excavation in foundation pits, trenches, misc. works, etc. in soft rock upto depth mentioned below including shoring and dewatering, if necessary, trimming, ramming and preparing the bed for foundation and refilling around the foundation and in plinth with selected excavated earth, in layers not exceeding 150mm thick, watering, consolidation to ontain 90% proctor density and disposing of the surplus excavated materials within a distance of 300m, etc. complete as per specifications, drawings and as directed by the Engineer-in-charge. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054