- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of Directorate of Town Panchayats
- >
NTID 45219167
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowGeneral Fund 2025-2026 Constru in Theni - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "General Fund 2025-2026 Constru" in Theni, India.
Directorate of Town Panchayats
Theni, Tamil Nadu, India
NTID 45219167
- Opening Date : Wed 20th May, 2026
- Closing Date : Wed 20th May, 2026
- ₹ 1950000.00
- NTID 45219167
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
19500.00 -
Document Cost
Refer Documents -
Estimated Cost
1950000.00
BOQ Items Total Items : 5 | Total Qty : 1435
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification. | 314.00 | M3 |
| 2 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 45.00 | M3 |
| 3 | Supplying and errecting centering to sides and soffits inculding supports and strtting for drainage sides and culvertbody wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over(silver oak joists) of size 10cm x 6.50cm spaced at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO. 30 & 86 | 768.00 | M2 |
| 4 | Plain Cement Concrete 1:2:4 (One Part of cement, two Part of sand, four Part of Aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete to site and other incidental charges etc., complete. as per standard specification 28 V,VI S25 | 116.00 | M3 |
| 5 | Granolithic Floor finishing with Cement Concrete 1:2:4 (One part of cement, two parts of sand and four parts of ISS HBG metal) mix using 10mm to 12mm ISS size HBG metal to 25mm thick including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:39-F | 192.00 | M2 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054