Inquiry NowGeneral-copt-shore Protection in Ernakulam - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "General-copt-shore Protection " in Ernakulam, India.
- Opening Date : Fri 15th May, 2026
- Closing Date : Wed 13th May, 2026
- ₹ 1082623135.00
- NTID 44966486
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
500000.00 -
Document Cost
17700.00 -
Estimated Cost
1082623135.00
BOQ Items Total Items : 36 | Total Qty : 775495.001
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | APPENDIX A - Shore protection Measures at Puthuvypeen coast along IOCL Stretch-GROYNE & SEA WALL | ||
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 42000.000 | cum |
| 3 | OD21120/2026-2027:Supplying granite quarry run from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 5 kg to 10 kg category stones of approved quality with specific gravity ranging from 2.65 to 2.8 for forming the filter layer of breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater including conveyance from sorting platform and dumping stones using tippler (3.5x2.5 sqm size) or any suitable methods installed at site on a moving crane having a capaciaty of not less than 20T and placing the stones at sea bed in uniform layer of design thickness for forming filter layer of breakwater as per the approved drawing and design and inspecting the profile once in a week including hire and operational charges of T & P, tippler, crane and all incidental charges etc. complete as per the direction of departmental officers at site. Ernakulam District | 31900.001 | tonne |
| 4 | OD21119/2026-2027:Supplying granite blasted rock from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 50kg to 300kg category stones of approved quality having specific gravity ranging from 2.65 to 2.8 for forming the core of rubble mound breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and rehandling and forming the core of the break water to the lines and levels as per the approved drawings and inspecting the profile once in a week with tolerance of +/- 20cm in final levels including all cost and labour charges, hire and operational charges of light crane and cost of spalls/ quarry muck and labour for forming the roadway for movement of lorries/ tippers / cranes etc including all incidental charges etc complete as per the direction of departmental officers at site Ernakulam District | 53100.000 | tonne |
| 5 | OD21114/2026-2027:Supplying blasted rock from approved quarry to sorting site and sorting the stones into 300kg to 800kg category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the secondary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the secondary armour and berm of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site Ernakulam District | 43850.000 | tonne |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054