- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of State Industries Promotion Corporation Of Tamilnadu Limited
- >
NTID 46198701
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowFormation Of Approach Road ch in THOOTHUKUDI - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Formation Of Approach Road ch" in THOOTHUKUDI, India.
State Industries Promotion Corporation Of Tamilnadu Limited
THOOTHUKUDI, Tamil Nadu, India
NTID 46198701
- Opening Date : Tue 8th September, 2026
- Closing Date : Mon 7th September, 2026
- ₹ 113200000.00
- NTID 46198701
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
576000.00 -
Document Cost
Refer Documents -
Estimated Cost
113200000.00
BOQ Items Total Items : 72 | Total Qty : 84996.02
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Part A - Formation of Approach Road | ||
| 2 | Clearing Heavy Jungle. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc., complete complying with standard specification and as directed by SIPCOT Officers. | 11845 | Sqm |
| 3 | Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the or as indicated by the SIPCOT Officer etc., complete complying with standard specification and as directed by SIPCOT Officers. a) box cutting for widening portion | 11904 | Cum |
| 4 | Supply and laying NP4 class - 300mm dia pipes including collar as directed by SIPCOT Officer etc., complete complying with standard specification and as directed by SIPCOT Officers. | 190 | Rm |
| 5 | Forming embankment using Carted earth with 20 Km lead which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 250 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 95% proctor density for the soil below the top of 0.5 meter height of subgrade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 95% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete as per MORTH standard specification. etc., complete complying with standard specification and as directed by SIPCOT Officers. (Forming Embankment using Carted earth at 95% Compaction) | 856 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054