- Home
- >
- Tender
- >
- Goa Tender
- >
- Department of Public Works Department
- >
NTID 44399526
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowFilling Up Repairs To The Poth in Salcete - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Filling Up Repairs To The Poth" in Salcete, India.
- Opening Date : Wed 25th March, 2026
- Closing Date : Mon 23rd March, 2026
- ₹ 120300000.00
- NTID 44399526
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2203000.00 -
Document Cost
40000.00 -
Estimated Cost
120300000.00
BOQ Items Total Items : 1 | Total Qty : 100000
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Repairs to potholes by a Jet Patcher / Velocity Patcher/Cold Mix Spray Injection Patchwork Machine having an aggregate hopper size of minimum 5 cum and an emulsion tank of minimum 1 cum with heavy duty Air Compressor/ Rotary Positive Displacement Blower with direct drive, auxiliary engine with direct drive to heavy duty blower, a separate airline silencer, a compressor for cleaning the surface and water spraying mechanism for dust control, using semi-dense bituminous concrete in cold mix by using stone aggregate of specified grade and RS-I emulsion @ 6.5 by weight of the mix, including cutting of the pot hole to a geometrical shape and size using a cutting machine, thorough cleaning of the pothole, removal of loose debris, dewatering in potholes, transporting the material to the work site by a mobile truck mounted on the jet patching equipment, spraying the cold RS-I emulsion as a prime coat @ 2.5 kg per sq m of the pot hole area, laying the mix and compacting the laid cold mix with a minimum 4 tone statice road roller, to achieve a compacted thickness of upto 50 mm, by maintaining the profile of the portion of the existing road, abuting the potholes, emulsion grouting to seal alll voids followed by pouring of a layer of dry aggregate, before opening to traffic, complete, as per directions of Engineer-in-charge. The rate shall also include providing traffice safety and control measures as specified under Section 112.4 of MoRTH specifications, charges towards quality control tests & remedying of deffects, if any, during deffects liability period of 18 months. | 100000.00 | cu.m. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054