- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of GORKHALAND TERRITORIAL ADMINISTRATION
- >
NTID 44334046
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowExtension Of Football Ground U in Darjeeling - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Extension Of Football Ground U" in Darjeeling, India.
GORKHALAND TERRITORIAL ADMINISTRATION
Darjeeling, West Bengal, India
NTID 44334046
- Opening Date : Mon 30th March, 2026
- Closing Date : Fri 27th March, 2026
- ₹ 31369605.00
- NTID 44334046
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
627392.00 -
Document Cost
Refer Documents -
Estimated Cost
31369605.00
BOQ Items Total Items : 18 | Total Qty : 26891.971
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depthbeyond 1.500 mm. | 2693.780 | Cum |
| 2 | (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | 1866.900 | Cum |
| 3 | (c) Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary. | 840.000 | Cum |
| 4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation | 1620.200 | Cum |
| 5 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 955.700 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054