- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of KOLKATA MUNICIPAL CORPORATION
- >
NTID 43177340
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowExtension Of Existing Service in Kolkata - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Extension Of Existing Service " in Kolkata, India.
KOLKATA MUNICIPAL CORPORATION
Kolkata, West Bengal, India
NTID 43177340
- Opening Date : Wed 14th January, 2026
- Closing Date : Sat 10th January, 2026
- ₹ 277198.00
- NTID 43177340
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
5545.00 -
Document Cost
Refer Documents -
Estimated Cost
277198.00
BOQ Items Total Items : 35 | Total Qty : 3700.11125
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 upto 5km | 275 | METER% |
| 2 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 per km beyond 5km to 10km | 275 | METER% |
| 3 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.25 Carriage of CI / Dl / ERWMS / AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (Including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete.diameter in mm 100 per km beyond 10km to 20km | 275 | METER% |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | 62.85 | CUBIC METER |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 244.6 | CUBIC METER PERCENT |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054