- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of Himachal Urban Development Authority
- >
NTID 44683199
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowExecution Of Civil Works For D in Hamirpur(HP) - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Execution Of Civil Works For D" in Hamirpur(HP), India.
Himachal Urban Development Authority
Hamirpur(HP), Himachal Pradesh, India
NTID 44683199
- Opening Date : Mon 6th April, 2026
- Closing Date : Sat 4th April, 2026
- ₹ 748088.00
- NTID 44683199
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 31 | Total Qty : 2728.65
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (up to all width), including dressing of sides and ramming of bottoms, up to all lift, including getting out the excavated soil and disposal of surplus excavated soil all lead and lifts as directed by the Engineer-in- charge. (a) All kinds of soil. | 20.25 | Cum |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including carriage of material in all leads and lifts. | 2.80 | Cum |
| 3 | Providing and laying in position cement concrete of 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centering and shuttering - All work up to plinth level including carriage of material in all leads and lifts. | 4.87 | Cum |
| 4 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. including carriage of material in all leads and lifts. ( All works upto plinth level | 4.51 | Cum |
| 5 | All works above plinth level upto floor V level | 11.47 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054