Excavation Of Spill Channel From Rd 80m To Rd 750m Of Kanupur Irrigation Project (balance Work).
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
419000.00 -
Document Cost
11800.00 -
Estimated Cost
41827146.00
BOQ Items Total Items : 10 | Total Qty : 908617.727
# | Item | Quantity | Units |
---|---|---|---|
1 | Clearing shrub jungles, uprooting stumps and small bushes and trees below 1.00M girth on pre-measurement including disposing off the debris clear of the work site with cost of all equipments, tools and plants, labour required for the work including all taxes, royalties etc. all complete as per the direction of the Engineer-in-charge. | 84477.250 | 100 Sqm |
2 | Excavation of Spill Channel in in both wet and dry condition by mechanical means in all kinds of soil (This shall include ordinary soil, sand, silt, slushy soil, hard soil, gravelly soil, stoney earth mixed with gravels, pebbles, stone boulder not exceeding 1/2cum by volume, moorum, etc.) including dewatering, rough dressing and levelling the excavated canal slopes and bed to design section and depositing the useful approved excavated earth in the channel embankments in filling section in layers not exceeding 22.5cm. in depth and breaking clods to maximum 5cm to 7cm size and depositing the un-useful surplus materials in spoil banks or on any other specified space with proper section, as directed, by mechanical means, including cost of all leads, lifts and de-lifts, loading and unloading, handling and re-handling, with all cost for site illumination, mobilisation and demobilisation, diversion road, coffer dam, and all taxes, royalties, T&P etc. complete, with all cost incidental to the work as per the design, drawing & specification and direction of the Engineer-in-charge.(Measurement will be taken on finished, level section.) | ||
3 | (a ) To be utilised | 135817.335 | One Cum |
4 | (b) To be disposed off | 220950.477 | One Cum |
5 | Excavation of Spill channel by mechanical means in DI rock, laterite rock and soft rock not requiring blasting, removable by pick-axe and crow bars, in both wet and dry condition, including cost of all incidental charges etc. and depositing the excavated materials either in spoil bank or in any other specified space, as directed, by mechanical means, including cost of all leads, lifts and de-lifts etc. including dewatering with all cost and running charges of pumps and accessories, building cofferdams, dressing and levelling the bed and sides to design section, with all cost for site illumination, mobilisation, demobilisation and all taxes, royalties, T&P etc. complete as per the design, drawing & specification and direction of the Engineer-in-charge. (Measurement will be taken on finished level section) | 84536.995 | One Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane