Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Erecting Compound Wall At Boun" in Goa, India.
- Opening Date : Wed 5th August, 2026
- Closing Date : Tue 4th August, 2026
- ₹ 1685677.00
- NTID 45909376
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
25300.00 -
Document Cost
2360.00 -
Estimated Cost
1685677.00
BOQ Items Total Items : 17 | Total Qty : 3819
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in dense or hard soil/murrum, soft rock with earth pocket and boulders, Hard rock including removal of obstructions such as small trees, vegetation etc. and removal of excavated material up to a lead of 50m and a lift of 1.5m including refilling foundation trenches. All labour and material etc. complete. | 40.00 | cum |
| 2 | Earthwork excavation in hard rock, laterite boulders interspersed with murrum etc. including removal of obstruction such as small trees, vegetation etc., refilling the trenches with suitable excavated material or earth removed from nearby areas and removal of unsuitable excavated material up to a lead of 50m and a lift of 1.5 m. All labour and material etc. complete. | 7.00 | cum |
| 3 | Soling with hard laterite rubble stone of 20 cm to 30 cm size including hand packing etc. complete. All labour & material ,tools & plant etc. complete | 6.00 | cum |
| 4 | Cement concrete (1:3:6) using 20 mm graded black trap stone metal out of quarried boulders as coarse aggregate including mixing, depositing, consolidating, levelling, curing etc. all labour and material etc. complete. | 4.00 | cum |
| 5 | Constructing masonry in foundation and plinth using precast cement concrete solid blocks having a crushing strength of not less than 35kg./cm2 (28 days curing) with a mix not leaner than (1:5:10) in cement mortar (1:6) including providing specially moulded blocks at junctions & corners, curing etc. All labour & material etc. complete. | 20.00 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054