- Home
- >
- Tender
- >
- Madhya Pradesh Tender
- >
- Department of National Handloom Development Corporation Limited
- >
NTID 44264631
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowEpoxy Painting Of Spillway Rad in East Nimar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Epoxy Painting Of Spillway Rad" in East Nimar, India.
National Handloom Development Corporation Limited
East Nimar, Madhya Pradesh, India
NTID 44264631
- Opening Date : Tue 24th March, 2026
- Closing Date : Sat 21st March, 2026
- ₹ 9629030.00
- NTID 44264631
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
193000.00 -
Document Cost
1180.00 -
Estimated Cost
9629030.00
BOQ Items Total Items : 4 | Total Qty : 13752.47
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Painting of spillway gates, sluice gates, canal gates (both vertical and radial), stoplog gates, exposed embedded parts and all unmachined ferrous surface (hoist cylinders, cylinder heads, hydraulic piping, pipe fittings, bonnet covers) exposed to water as per IS 14177, for which surface preparation by blast cleaning of Class "B" primer coat (one coat) of inorganic Zinc Silicate (preferably airless spray) or alternatively, two coat of zinc rich primer (containing not less than 85% zinc on dry film) to give dry film thickness of 70+/-5 microns and finish coat (two coats) of solvent less coal tar epoxy paint, using airless spray, to provide dry film thickness of 150+/-5 microns per coat. Thus, total dry film thickness of all the coats, including primer coating, should not be less than 350 microns. This will include expenses on mobilisation & demobilisation of equipments. For maintenance painting, the surface preparation shall be done by appropriate hand and power tool cleaning. Prior to hand and power tool cleaning, any heavy layer of rust should be removed by chipping. Visible oil, grease, dirt and other foreign material be cleaned using solvents like clean minerals spirits, xylot or white gasoline. After hand and power tool cleaning, the surface should be cleaned of loose dust and debris and/or blast cleaned as laid down in para 7.0 of IS Code 14177. After the surface preparation, the primer and finishing coats shall be carried out as provided above for painting. (i) Area Upto 1.5M Height for 20Nos. Spillway Radial Gates (U/s), 12 Nos. Spillway Stoplogs etc. | 3257.86 | Sqm |
| 2 | Painting of spillway gates, sluice gates, canal gates (both vertical and radial), stoplog gates, exposed embedded parts and all unmachined ferrous surface (hoist cylinders, cylinder heads, hydraulic piping, pipe fittings, bonnet covers) exposed to water as per IS 14177, for which surface preparation by blast cleaning of Class "B" primer coat (one coat) of inorganic Zinc Silicate (preferably airless spray) or alternatively, two coat of zinc rich primer (containing not less than 85% zinc on dry film) to give dry film thickness of 70+/-5 microns and finish coat (two coats) of solvent less coal tar epoxy paint, using airless spray, to provide dry film thickness of 150+/-5 microns per coat. Thus, total dry film thickness of all the coats, including primer coating, should not be less than 350 microns. This will include expenses on mobilisation & demobilisation of equipments. For maintenance painting, the surface preparation shall be done by appropriate hand and power tool cleaning. Prior to hand and power tool cleaning, any heavy layer of rust should be removed by chipping. Visible oil, grease, dirt and other foreign material be cleaned using solvents like clean minerals spirits, xylot or white gasoline. After hand and power tool cleaning, the surface should be cleaned of loose dust and debris and/or blast cleaned as laid down in para 7.0 of IS Code 14177. After the surface preparation, the primer and finishing coats shall be carried out as provided above for painting. (ii) Area Beyond 1.5M Height for 20Nos. Spillway Radial Gates (U/s), 12 Nos. Spillway Stoplogs etc. | 9255.99 | Sqm |
| 3 | Painting of structural components of Hoist including supporting structures and surfaces of hydraulic hoist sun exposed to water as per IS:14177, for which surface preparation by blast cleaning of class 'B', primer coat (two coats) of Zinc phosphate primer to give dry film thickness of 40 5microns per coat and finish coat(one coat) of alkyd based micaceous iron oxide paint give dry film thickness of 65 5 microns followed by two coats of synthetic enamel paint, using airless spray, to give dry film thickness of 25 5 microns per cost, at an interval of 24 hours. Thus total dry film thickness of all the coats, including primer coating, should not be less than175 microns. This will include expenses on mobilisation and demobilisation of equipment s. For maintenance painting, the surface preparation shall be done by appropriate hand and power tool cleaning. Prior to hand and power tool cleaning, any heavy layer of rust should be removed by chipping. Visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylol or white gasoline. After hand and power tool cleaning, the surface should be cleaned of loose dust and debri sand / or blast cleaned as laid down in para 7.0 of IS Code14177. After the surface preparation, the primer and finishing coats shall be carried out as provided above for painting etc. complete (i) Area Upto 1.5M Height for 8 Nos. Hydraulic Cylinders of Intake Gates. | 7.20 | Sqm |
| 4 | Painting of structural components of Hoist including supporting structures and surfaces of hydraulic hoist sun exposed to water as per IS:14177, for which surface preparation by blast cleaning of class 'B', primer coat (two coats) of Zinc phosphate primer to give dry film thickness of 40 5microns per coat and finish coat(one coat) of alkyd based micaceous iron oxide paint give dry film thickness of 65 5 microns followed by two coats of synthetic enamel paint, using airless spray, to give dry film thickness of 25 5 microns per cost, at an interval of 24 hours. Thus total dry film thickness of all the coats, including primer coating, should not be less than175 microns. This will include expenses on mobilisation and demobilisation of equipment s. For maintenance painting, the surface preparation shall be done by appropriate hand and power tool cleaning. Prior to hand and power tool cleaning, any heavy layer of rust should be removed by chipping. Visible oil, grease, dirt and other foreign material be cleaned using solvents like clean mineral spirits, xylol or white gasoline. After hand and power tool cleaning, the surface should be cleaned of loose dust and debri sand / or blast cleaned as laid down in para 7.0 of IS Code14177. After the surface preparation, the primer and finishing coats shall be carried out as provided above for painting etc. complete (ii) Area Beyond 1.5M Height for 8 Nos. Hydraulic Cylinders of Intake Gates & 40Nos. Hydraulic Cylinders of Radial Gates etc. | 1231.42 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054