- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of PUBLIC HEALTH ENGINEERING DEPARTMENT
- >
NTID 42634380
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Engagement Of Sk in Kolkata - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Engagement Of Sk" in Kolkata, India.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Kolkata, West Bengal, India
NTID 42634380
- Opening Date : Fri 26th December, 2025
- Closing Date : Tue 23rd December, 2025
- ₹ 0.00
- NTID 42634380
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
51000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | DATE CORRIGENDUM | Date |
BOQ Items Total Items : 2 | Total Qty : 377
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Engagement of skilled labours (3nos. for each shift for 3nos. of shift i.e. 9 persons on daily wage basis) for regular operation of pumping machinery, valves, washing of filter bed and other necy. Works for mtc. Of regular W/S from WTP including guarding the whole installation at night for requisite period (inclu. Occasional chlorination if reqd.) for the High Lift and medium lift pump house of Baranagar Kamarhati Jnt. W/S Scheme.(engagement will be on temporary basis as and when required for the period.) : w.e.f. (01.01.2026 to 31.12.2026) 365 Days Details of Pump House:- a) H/L Pump House:- i) 50 HP motor run centrifugal pump set (Q=135m3/hr., H-37 mtr) - 2 sets ii) 35 HP motor run centrifugal pump set (Q=90m3/hr., H-37 mtr) - 3 sets b) Medium Lift Pump House:- i) 30 HP motor run centrifugal pump set (Q=250m3/hr., H-20 mtr) - 5 sets c) Different valves ranging from dia - 125mm. To 600mm. And alum room operation. | 365 | Days |
| 2 | Examining the p/m & elect. Installation at the High Lift, (consisting of 5 nos. centrifugal pump sets ranging from 50 HP to 35 HP, its operating system, distribution system, panel, cables, illumination including taking care of sump pumps and outdoor lightings as well) Medium lift (consisting of 5 nos. centrifugal pump sets each of 30 HP, its operating system, distribution system, panel, cables, illumination including taking care of sump pumps and outdoor lightings as well) & WTP (including chemical room, clarrifloceutor, its operating system cable, panel, illumination etc.) including indoor & outdoor lighting arrangement on regular basis by skilled electricians including attending minor faults, troubleshooting and providing necessary petty materials, like kitkat, fusewire, connecting wire, sockets, tools etc. as & when required including testing for the period. | 12 | Months |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054