Inquiry NowEmergent Repair For The Stretc in PORT BLAIR - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Emergent Repair For The Stretc" in PORT BLAIR, India.
national highways infrastructure and development corporation ltd
NTID 42813929
- Opening Date : Fri 28th November, 2025
- Closing Date : Thu 27th November, 2025
- ₹ 4943000.00
- NTID 42813929
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
98860.00 -
Document Cost
11800.00 -
Estimated Cost
4943000.00
BOQ Items Total Items : 20 | Total Qty : 5357.11
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing and Grubbing Road Land : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness, as per direction of the Engineer-in-charge. | 0.88 | Ha |
| 2 | Granular Sub-Base with Graded Material: Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401, as per direction of the Engineer-in-charge. | 51.50 | CUM |
| 3 | CC Shoulder: PCC Grade M20 using batching plant transit mixer & Concrete pump, as per direction of the Engineer-in-charge. | 10.50 | CUM |
| 4 | Wet Mix Macadam (Plant Mix Method): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, as per direction of the Engineer-in-charge. | 61.76 | CUM |
| 5 | Prime Coat over WMM/WBM : Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means, as per direction of the Engineer-in-charge. | 1048.72 | SQM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054