- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of HOUSING DIRECTORATE
- >
NTID 32452285
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowEmergent Renovation Work For 3 in Kolkata - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Emergent Renovation Work For 3" in Kolkata, India.
HOUSING DIRECTORATE
Kolkata, West Bengal, India
NTID 32452285
- Opening Date : Mon 10th July, 2023
- Closing Date : Thu 6th July, 2023
- ₹ 245874.00
- NTID 32452285
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
4917.00 -
Document Cost
Refer Documents -
Estimated Cost
245874.00
BOQ Items Total Items : 27 | Total Qty : 725.5223
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. | 7.704 | cum |
| 2 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety | 3.825 | cum |
| 3 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m II. Other than SAIL/ TATA/RINL JSW/JSPL/SHYAM/SRMB....etc. | 0.3753 | MT. |
| 4 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (b) Above 30 mm & upto 37 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | 27.915 | SqM |
| 5 | Brick work with 1st class bricks in cement mortar (1:6) (b) In superstructure, ground floor | 0.563 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054