- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Dakshinanchal Vidyut Vitran Nigam Ltd.
- >
NTID 44361993
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowElectrification Of New Sites O in Banda - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Electrification Of New Sites O" in Banda, India.
Dakshinanchal Vidyut Vitran Nigam Ltd.
Banda, Uttar Pradesh, India
NTID 44361993
- Opening Date : Fri 13th March, 2026
- Closing Date : Fri 13th March, 2026
- ₹ 950000.00
- NTID 44361993
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 26 | Total Qty : 1112.783
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | The work of erection of 11 KV HT/LT Lines & 63/100 KVA Sub-Stations for electrification of various sites of Payjal Punargathan Yojana under FULL DEPOSIT SCHEME 2025-26 under EDD, Atarra, including carriage of all required material from ESC Banda to work site, alongwith its loading, unloading & dragging at the respective ends and also safe carriage of old line material/scraped from site to store centre, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- | ||
| 2 | Safe cartage of 11 Mtr. long ST poles from store centre to the respective site of work. | 64.00 | No |
| 3 | Safe cartage of line material viz. conductor, cable, G.I. earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work. | 50.00 | Qtl |
| 4 | Erection & grouting of SP structure on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each). All grouting material arranged by contractor at his own cost. | 44.00 | No |
| 5 | Erection & grouting of DP structure on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each). All grouting material arranged by contractor at his own cost. | 10.00 | No |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054