- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of TIDEL Neo Limited
- >
NTID 43425210
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowE Tender For Construction Of I in Erode - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "E Tender For Construction Of I" in Erode, India.
TIDEL Neo Limited
Erode, Tamil Nadu, India
NTID 43425210
- Opening Date : Tue 3rd February, 2026
- Closing Date : Mon 2nd February, 2026
- ₹ 0.00
- NTID 43425210
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1900000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 1052 | Total Qty : 264767.33
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORK | ||
| 2 | Clearing Light jungle and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 15500.00 | Sqm |
| 3 | Earth work Excavation | ||
| 4 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental of cers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard speci cation and as directed by the departmental officers. Excavated should not be used for back filling / Plinth Filling. Upto 0 to 2.00m Footing Depth. | 2973.50 | Cum |
| 5 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental of cers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard speci cations and as directed by the departmental officers. Excavated should not be used for back filling / Plinth Filling. for Footing Depth 2.00m to 3.0m | 229.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054