Inquiry NowDevelopment Of Ramleema Park N in Ghaziabad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Development Of Ramleema Park N" in Ghaziabad, India.
Uttar Pradesh State Industrial Development Corporation Limited
Ghaziabad, Uttar Pradesh, India
NTID 46984795
- Opening Date : Mon 12th October, 2026
- Closing Date : Mon 12th October, 2026
- ₹ 13358967.00
- NTID 46984795
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
315272.00 -
Document Cost
4810.00 -
Estimated Cost
13358967.00
BOQ Items Total Items : 66 | Total Qty : 1232221.61
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation of foundation in ordinary soil (Loam,clay or sand) including lift upto 1.5 M and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation trencehs. SI No. 251 A | 21.78 | cum |
| 2 | Cement Concrete with 4cm gauge stone ballast coarse sand & cement in proportion of 1:4:8 In foundation and under floor including supply of all materials labour tools and plants etc required for proper completion of the work. | 1.09 | cum |
| 3 | R.C.C. work with cement approved coarse sand and 2 cm. Gauge approved stone grit in proportions of 1:1.5:3 in T. Beam, Slab Roof and R.C.C. Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid. Excluding GST. | 5.18 | cum |
| 4 | M.S. or iron work of small sizes and section such as holding down bolts , hold fast , tie rods grating etc. wrought to required from including supply of steel bolts , nuts wastage etc. and their fixing required for proper completion of work. | 2.14 | Qtls |
| 5 | M.S. ( tor steel or plain) in plain work such as R.C.C. of R.B. work including bending for proper shape as necessary including bending for proper completion of the work and including supply of all steel & Wastage, bend, hooks and authorised overlapping shall be measured (Analysis Attached) | 2.1 | Qtls |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054