NTID 44145345
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowDevelopment Of Periphery Road in Cuttack - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Development Of Periphery Road " in Cuttack, India.
- Opening Date : Wed 18th March, 2026
- Closing Date : Fri 13th March, 2026
- ₹ 10738194.00
- NTID 44145345
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
214764.00 -
Document Cost
10000.00 -
Estimated Cost
10738194.00
BOQ Items Total Items : 13 | Total Qty : 19042.02
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Construction of Bitumen Road | ||
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. including all cost, conveyance, taxes of all materials and all labour, T&P, Sundries required for the work etc. complete as per the specification and the direction of Engineer in charge. | 4777.220 | Sqm |
| 3 | Earth work in all kind of soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the engineer-in-charge. | 955.440 | Cum |
| 4 | Loosening minimum 150mm thick, Leveling Compacting original ground supporting embankment to facilitate construction of earthen embankment, sprinkling water to OMC and compacting by rolling so as to achieve minimum required, density table 300-1,300-2 in embankment construction as per technical specification part I/II under CL 303 & 112 table No.- 300-1 of specification for road and bridge works MORT&H(5th revision) complete including full compensation of all operations, all inclusive costs, contigencies, incidentals involved for the finised defect free item of work complete to specification as per the direction of Engineer-in-charge.(AR-2006/Pg.No.158/Sr No.37) | 716.580 | Cum |
| 5 | Providing,laying Moorum in Sub base in layers not exceeding 150mm thick,watering and rolling with PRR up to OMC specification including cost, conveyance, royalties & taxes of all materials with cost of all labour, T&P required for the work etc. complete as per the direction of the Engineer-in-charge. | 1194.310 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054