- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of KOLKATA MUNICIPAL CORPORATION
- >
NTID 42785378
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowDevelopment Of Footpath By Pav in Kolkata - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Development Of Footpath By Pav" in Kolkata, India.
KOLKATA MUNICIPAL CORPORATION
Kolkata, West Bengal, India
NTID 42785378
- Opening Date : Sat 13th December, 2025
- Closing Date : Thu 11th December, 2025
- ₹ 999695.00
- NTID 42785378
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20000.00 -
Document Cost
Refer Documents -
Estimated Cost
999695.00
BOQ Items Total Items : 21 | Total Qty : 2522.9653
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 41.12 | %M3 |
| 2 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 6. Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. | 411.25 | SQM |
| 3 | Labour for taking out old soling edging including removing debris.(a) Single flat soling | 411.25 | %M2 |
| 4 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand(5th Corrigenda & addenda dated 16.04.2019) | 41.12 | %M3 |
| 5 | Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. | 246.75 | SQM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054