- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of Himachal Urban Development Authority
- >
NTID 45995407
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowDevelopment Of Education Infra in Shimla - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Development Of Education Infra" in Shimla, India.
Himachal Urban Development Authority
Shimla, Himachal Pradesh, India
NTID 45995407
- Opening Date : Thu 30th July, 2026
- Closing Date : Wed 29th July, 2026
- ₹ 790166.00
- NTID 45995407
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 42 | Total Qty : 2613.63
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Cutting/Excavation in earth work by mechanical means (Hydraulic Excavator/manual means in all heights and depth in all kind of soil including saturated soil comprising of pick wok, jumper, Chiselling/wedging out of in soft and hard rock and their intermiate classification of soils including dewatering wherever required, setting out to required lines, levels as shown shown on the drawing as directed by the Engineer- in -charge at site, according to the HPPWD specification of 1990 vol-1 as sorting out usefull and unuseful material and stacking the same in all lead and lift and leveling of excavated earth on dumping sites (to be arranged by the contractor at his own risk and cost including payment of prescribed dumping charges of municipal committee/local body if any) through all modes of transportation including head load animal load and mechanical transportation to maximum possible extends in all leads means along with levelling fine dressing and all labour, machinery, materials, tools equipments and safty measure and incidentels necessary to complete the work by mechanized means and labour (if any required). All useful materials such as stone, shingles, aggregate and slates shall be sorted along road side and lift through all modes of transportation and used/removed as per direction of the Engineer-in-charge. Any loss to the private and public property during the course execution will be restored by the contractor whatsoever the nature of the same may be. The usable aggregate/ boulder /cutstone shall be taken in MAS Account anf further will be issued to the contractor as per issue rate mentioned under condition No. 46 of NIT Form 6. | 96.75 | Cum |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil in all lead and lift as directed and entire satisfaction of the Engineer -in -charge in All kinds of soil. | 23.55 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering including carriage of material in all leads and lifts. All work up to plinth level | ||
| 4 | 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2.62 | Cum |
| 5 | 1:5:10 (1 Cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.9 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054