- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of V O CHIDAMBARANAR PORT TRUST
- >
NTID 43696853
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowDesign Engineering Supply Inst in Tuticorin - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Design Engineering Supply Inst" in Tuticorin, India.
V O CHIDAMBARANAR PORT TRUST
Tuticorin, Tamil Nadu, India
NTID 43696853
- Opening Date : Tue 17th February, 2026
- Closing Date : Mon 16th February, 2026
- ₹ 803861979.00
- NTID 43696853
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
16077240.00 -
Document Cost
Refer Documents -
Estimated Cost
803861979.00
BOQ Items Total Items : 11 | Total Qty : 11
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Design, Engineering, Supply, Installation and Commissioning of an 8 MW Wind Farm at VOCPA Port Estate, Tuticorin, including Civil, Electrical and Communication Works, Power Evacuation System, Grid Connectivity in compliance with DISCOM (TANGEDCO) norms, along with a 2-year warranty and free Operation & Maintenance (O&M) period. | 1 | set |
| 2 | Design, Engineering, Supply, Installation, Testing and Commissioning of a 5 MWh Battery Energy Storage System (BESS), including integration with the Renewable Energy infrastructure and grid system, in compliance with applicable DISCOM norms, along with a 2-year comprehensive warranty and free Operation & Maintenance (O&M) period. | 1 | set |
| 3 | Integration of all Renewable Energy projects with the Port s power and grid systems, and development of a centralized real-time monitoring and analytics Dashboard with a 2-year free comprehensive maintenance Period. | 1 | set |
| 4 | 3rd year Comprehensive O&M of 8 MW Wind Farm, 5 MWh Battery Energy Storage System (BESS) and centralized real-time monitoring and analytics Dashboard. | 1 | set |
| 5 | 4th year Comprehensive O&M of 8 MW Wind Farm, 5 MWh Battery Energy Storage System (BESS) and centralized real-time monitoring and analytics Dashboard. | 1 | set |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054