- Home
- >
- Tender
- >
- Arunachal Pradesh Tender
- >
- Department of Urban Development and Housing Department
- >
NTID 44461552
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowDesign Build And Commission O in Lower Dibang valley - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Design Build And Commission O" in Lower Dibang valley, India.
Urban Development and Housing Department
Lower Dibang valley, Arunachal Pradesh, India
NTID 44461552
- Opening Date : Sat 21st March, 2026
- Closing Date : Sat 21st March, 2026
- ₹ 0.00
- NTID 44461552
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2071960.00 -
Document Cost
10000.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 315 | Total Qty : 204627.57
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Construction of RCC elevated Platform for screen channel and Grit Chamber | ||
| 2 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required into plinth sides of foundation etc. consolidating each deposited layer by arming and watering of all surplus soil as directed within a lead of 50m in all types of soils for footings | 34.55 | Cum |
| 3 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required into plinth sides of foundation etc. consolidating each deposited layer by arming and watering of all surplus soil as directed within a lead of 50m 10% of the Total Qty | 3.84 | Cum |
| 4 | Filling with sand including watering, ramming, consolidating and dressing complete.Below CC bed Below CC bed | 1.09 | Cum |
| 5 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.CC Bed | 1.09 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054