- Home
- >
- Tender
- >
- Himachal Pradesh Tender
- >
- Department of Indian Institute of Technology Mandi
- >
NTID 45789319
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowDesign And Construction Of Bam in Mandi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Design And Construction Of Bam" in Mandi, India.
Indian Institute of Technology Mandi
Mandi, Himachal Pradesh, India
NTID 45789319
- Opening Date : Mon 27th July, 2026
- Closing Date : Fri 24th July, 2026
- ₹ 18271251.00
- NTID 45789319
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
365425.00 -
Document Cost
1180.00 -
Estimated Cost
18271251.00
BOQ Items Total Items : 21 | Total Qty : 3623
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth within all lead and lift as directed by Engineer-in-Charge. a) All kinds of soil as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 107.00 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a)1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 32.00 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 24.00 | Cum |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centesring, shuttering, finishing and reinforcement - All work up to plinth level : a)1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 5.00 | Cum |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. a) Thermo-Mechanically Treated bars of grade Fe-500D or more as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 600.00 | Kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054