Inquiry NowDeposite Work Under Edd-2 Orai in Orai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Deposite Work Under Edd-2 Orai" in Orai, India.
Dakshinanchal Vidyut Vitran Nigam Ltd.
Orai, Uttar Pradesh, India
NTID 42967000
- Opening Date : Fri 12th December, 2025
- Closing Date : Fri 12th December, 2025
- ₹ 2000000.00
- NTID 42967000
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20000.00 -
Document Cost
3000.00 -
Estimated Cost
2000000.00
BOQ Items Total Items : 31 | Total Qty : 20522
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Cartage of 8.5 M PCC Pole/11 M STP/13 M STP Poles From Store Orai or From any other place to the respective site of work through the Kachha Pacca road including at the respective ends also including etc and also inlcuding the cost of labour T&P carrier etc required for proper completion of work. | 200 | Nos |
| 2 | Cartage of line material viz top channel Dropper channel Disc Insulator and other line material from ESC/ASK Store Orai or any other place to the respective site of work through the kachha pacca road including the work of its loading & unloading at the respective ends including the work of its dragging etc and also including the cost of labour T&P and carrier etc required for proper completion of Work. | 200 | Qtl |
| 3 | Erection of 8.5 M PCC Pole/11 M STP/ 13 M STP Pole Single Support of poles including complete HT/LT Fitting as per RESSPO manual and as per direction of Engineer in charge the cost of labour T&P and Carrier etc required for proper completion of work. | 200 | Nos |
| 4 | Grouting of 8.5 M PCC Pole/11 M STP/13 M STP Pole as per RESSPO Manual and as per direction of Engineer incharge including the cost of Labour T&P and Carrier etc required for proper completion of work. The support shall be grouted with cement sand & Bricks/stone ballast in ration 1:4:8 including the cost of arrangement of cement sand brick ballast/stone ballast stone pad etc as per actual site required. (All required Grouting Material Provided by Contractor) | 200 | Nos |
| 5 | Erection & Grouting of Stay Set as per RESSPO manual and also inlcuding the cost of all grouting material labour T&P etc required for proper completion of work. (All required Grouting Material Provided by Contractor) | 60 | Nos |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054