- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of MUNICIPAL CORPORATION
- >
NTID 42742969
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowDeepening Bund Strengthening in Avadi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Deepening Bund Strengthening" in Avadi, India.
MUNICIPAL CORPORATION
Avadi, Tamil Nadu, India
NTID 42742969
- Opening Date : Mon 17th November, 2025
- Closing Date : Mon 17th November, 2025
- ₹ 5000000.00
- NTID 42742969
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
Refer Documents -
Estimated Cost
5000000.00
BOQ Items Total Items : 17 | Total Qty : 4430.6
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Hire charges for deploying earth moving machinery Poclain for Deepening, Bund Strengthening and earthwork including diesel, oil and labour charges etc.,complete. | 240.00 | Hrs |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 24.00 | M3 |
| 3 | Earth work excavation in all classes of soils except sand and rock such as hard stiff clay block cotton shales murrums hard red earth soft rock or kankar etc with initial lead and lift and depositing on banks as per SS 20 B for foundation | 108.00 | M3 |
| 4 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Sand and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 65.00 | M3 |
| 5 | Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30 | 456.00 | M2 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054