- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Public Works Department
- >
NTID 43620281
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Widening And Str in Azamgarh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Widening And Str" in Azamgarh, India.
Public Works Department
Azamgarh, Uttar Pradesh, India
NTID 43620281
- Opening Date : Fri 20th February, 2026
- Closing Date : Fri 20th February, 2026
- ₹ 125000000.00
- NTID 43620281
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
2500000.00 -
Document Cost
5590.00 -
Estimated Cost
125000000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date Extension | Date |
| 2 | Date Extension1 | Date |
BOQ Items Total Items : 30 | Total Qty : 181697.49
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation for road work in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading tipper triming bottom and side slop in accordance with requirement of lime, grade and cross section and transporting of the embankment loctiong within all lift and lead. as per MoRTH specification No. 301 (Including all taxes but excluding GST) | 8910.000 | Cum |
| 2 | Construction of Embankment with Material deposited from Roadway Cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 (Including all taxes but excluding GST) | 8910.000 | Cum |
| 3 | Construction of Embankment with Material obtained from road side without lead) :-Construction of embankment with approved materials obtained from borrowpits with all lifts and leads, transporting to site , speading grading to required slope and compating to meet requirement of table 300-2 (without lead) (Data Book Sr. No. 3.16) material obtained from right way (Including all taxes but excluding GST) | 23506.100 | Cum |
| 4 | Construction of Embankment with Material obtained from Borrowpits :- Construction of embankment with approved materials obtained from borrowpits with all lifts and leads, transporting to site , speading grading to required slope and compating to meet requirement of table 300-2 from 5.00 Km. distance (Including all taxes but excluding GST) | 25726.800 | Cum |
| 5 | G.S.B Grade-1 Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete. (Including all taxes but excluding GST) | 4082.100 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane