ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Vill Baroda Jan in Jhansi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Vill Baroda Jan" in Jhansi, India.
U.P. State Construction and Infrastructure Development Corporation Ltd.
Jhansi, Uttar Pradesh, India
NTID 44717383
- Opening Date : Mon 13th April, 2026
- Closing Date : Mon 13th April, 2026
- ₹ 0.00
- NTID 44717383
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
20000.00 -
Document Cost
1062.00 -
Estimated Cost
Refer Documents
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date Extened | Date |
BOQ Items Total Items : 6 | Total Qty : 6178.508
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | RCC Nala | ||
| 2 | Excavation in foundation in ordinary soil (loam caly, or sand). Including lift upto 1.5 mt. (5 ft.) and lead upto 30 mt. (100 fts.) and including filling waterning and raiming of excavated earth in the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and dispsal of surplus earth as directed by the engeeneer in-charge upto a distance of 30 mt. from the foundation and trenches. Drain + Sitting Chamber + Collection Chamber | 232.875 | cum |
| 3 | Concrete with 4 mm. (1.5") gauge Stone ballast fine local sand of 1.25 Fitness modulouse and cement in Proportion of 1:3:6 , in foundation and under floors including supply of all materials labour and T&P etc. required for proper completion of the work. (1:3:6) Drain + Sitting Chamber + Collection Chamber | 14.569 | cum |
| 4 | RCC work with Cement, approved coarse sand, 20 mm gauge stone grit in the proportion 1:1.5:3 including centering and shuttering, lab, mat, and T&P all complete but excluding supply of reinfgorcement and its bending Drain Wall + Drain Bottom + Haunching (0.5x.15x.15= ) + Drain Cover + Slab Culvert + Silting & Collection chamber Long Walls + Silting chamber & Collection Short Walls + Silting chamber Cover + Collection Chamber Cover | 74.592 | cum |
| 5 | Mild Steel or iron work in RC/Brick work including cutting and bending for proper completion of the work etc. all complete. (S.I. No. 504) 1.0% Qty of rcc work = 1.0x7850x% | 5855.472 | Kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054