- Home
- >
- Tender
- >
- Madhya Pradesh Tender
- >
- Department of Madhya Pradesh Power Transmission Company Limited
- >
NTID 47031881
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Various Construc in birsinghpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Various Construc" in birsinghpur, India.
Madhya Pradesh Power Transmission Company Limited
birsinghpur, Madhya Pradesh, India
NTID 47031881
- Opening Date : Fri 6th November, 2026
- Closing Date : Thu 5th November, 2026
- ₹ 8364000.00
- NTID 47031881
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
167280.00 -
Document Cost
2360.00 -
Estimated Cost
8364000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | 1st date extension | Date |
BOQ Items Total Items : 91 | Total Qty : 35824
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Various Construction of 1 no. 220 kV & 1 no. 132 KV feeder bay alongwith transformer foundation for Addl. 200 MVA 220/132 kV Transformer at 220 kV S/s Birsinghpur. | ||
| 2 | 2.6, FOUNDATATION 220KV FEEDER BAY AND ADDL 200MVA TRANSFORMER Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) ... up to 1.5m, ... earth to be leveled and neatly dressed. (No extra lift is payable if work is done by mechanical means) All kinds of soil | 536 | Cum. |
| 3 | 4.1.2.3,Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : Nominal Mix -1 Cement : 4 sand : 8 graded stone aggregate (MM-7.5) | 8 | Cum. |
| 4 | 5.16.1,Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire up to floor two level including all wastage etc. complete. | 213 | kg |
| 5 | 5.16.6,Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire up to floor two level including all wastage etc. complete. TMT Bar | 8317 | kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054