- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of PRADHAN MANTRI GRAM SADAK YOJANA
- >
NTID 43921576
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Ut054292 L142 Ty in Chakrata - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Ut054292 L142 Ty" in Chakrata, India.
PRADHAN MANTRI GRAM SADAK YOJANA
Chakrata, Uttarakhand, India
NTID 43921576
- Opening Date : Tue 24th March, 2026
- Closing Date : Tue 24th March, 2026
- ₹ 87014000.00
- NTID 43921576
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1740000.00 -
Document Cost
5900.00 -
Estimated Cost
87014000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Corrigendum 03 Regarding Date extension | Date |
| 2 | Corrigendum 06 Regarding Date extension | Date |
BOQ Items Total Items : 78 | Total Qty : 155000.72
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | HILL SIDE CUTTING | ||
| 2 | Earth work in hill road (hill side cutting):- Excavation in hilly area for construction of road in all types of soils, rocks & E&B etc. As met at site true to lines as per plan, L section cross slope, super elevation as required also including uprooting & cutting of bushes dressing of road surface to the required level and slopes with all lift & lead, required for safe disposal of surplus excavated material at suitable dumping places indicated in the drawing by mechanical means/ manual means and including construction of required coolie walling of minimum height of 0.60 mt with the stone available from the required hill side cutting for retaining of the muck , without damaging forest , forest land , utility and private properties ,including its safe disposal (same as per mentioned above for safe disposal of surplus excavated material ), till the completion of the work as per part II special conditions of contract , MORD Specification Clause 1601, 1602 & 1603 and as directed by Engineer-in-charge. | 1.00 | LS |
| 3 | Removal of land slides (Slip clearance) in all type of soil and rock by mechanical means/ manual means and disposal of safe side only in after completion of hill side cutting as per road design as directed by Engineer-in-charge and MORD specifications , Clause 1611 . (Slip clearence considered only those reaches where the Hill side cutting has been completed and handed over to Engineer -In- Charge ) | 5920.69 | Cum |
| 4 | Disposal of exvacated material obtained from hill side cutting including loading and disposal up to 1000 M lead as directed by Engineer-in-charge and as per MORD specifications Clause 302.3.11 | 24000.00 | Cum |
| 5 | PROTECTION WORK : |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054