Tender for HINDUSTAN PETROLEUM COPR. LTD - NTID 35846049
HINDUSTAN PETROLEUM COPR. LTD
Mumbai, Maharashtra, India
NTID 35846049
- Opening Date : Tue 30th November, -0001
- Closing Date : Thu 9th May, 2024
- ₹ 0.00
- NTID 35846049
Corrigendum : Supply Of Operations And Maintenance Contract For Hpcl 2g Ethanol Bio Refinery At Bhatinda - Fixed Part O M Cost For 2g Ethanol Plant Mapower , Variable Part O M Cost For 2g Ethanol Plant Manpower , Hiring Of 3t Forklifts Grabbers Payloaders Lifting Equipment On Per Hour Rental Basis , Dismantling Of Equipment Excluding Heavy Equipment Charges Or Lifting Equipment , 3t Forklift Grabbers Payloaders Lifting Equipment Hiring On Rental Basis For 24 Hrs Basis , Instn Of Rotating Equipment Upto 10 Mt Pump Mixer Compressor Turbine Etc Excl Heavy Equipment Charges Or Lifting Equipment , Vessels Columns Drums Filters Instn Upto 10 Mt Excl Heavy Eqpmnt Or Lifting Eqpmnt Charges , Static Eqpmt Heat Exchngrs, Coolers, Condensrs Upto 10 Mt Excl Heavy Eqmnt Charges Lifting Eqpmt Instn , Vessels, Columns,drums, Filters Installation More Than 10 Mt And Upto 20 Mt Excluding Heavy Equipment Charges ,lifting Equipment , Static Equipment Such As Heat Exchangers Coolers Condensers Etc. Installation More Than 10 Mt And Upto 20 Mt Excluding Heavy Equipment Charges Lifting Equipment , Strip Lining Ss Lining Of Column, Vessel , Monel Of Column, Vessel, Strip Lining , Foam Cleaning Of Exterior Fin Fan Cooler Foam Cleaning Of Cooler , Mobilization Charges Per Visit Foam Cleaning Of Exterior Fin Fan Cooler , Heat Exchanger Revisioning Testing Single Unit Having Upto 150 Tubes For Pipes , Upto 150 Tubes For Rtj Flange , Up To 150 Tubes For Channel Box Opening Box Up , For Bundle Pulling And Insertion Upto 150 Tubes , Upto 150 Tubes Bundle Cleaning From Inside Outside Shell Cleaning For Heat Exchanger Revisioning And Testing , Up To 150 Tubes For Ring Test , Tubes Floating Head Test Single Unit Having Upto 150 , 150 Tubes Cover Test , 150 Tubes Repeated Ring Test , Individual Tube Testing 150 Tubes , 151 To 300 Tubes Pipes Heat Exchanger Revisioning And Testing , Single Unit Having 151 To 300 Tubes Rtj Flange , 151 To 300 Tubes Channel Box Opening Box Up , Bundle Pulling And Insertion Single Unit Having 151 To 300 Tubes , Bundle Cleaning From Inside, Outside And Shell Cleaning For 151 To 300 Tubes , Heat Exchanger Revisioning Testing Single Unit Having 151 To 300 Tubes Ring Test. , 151 To 300 Tubes Floating Head Test. , Cover Test 151 To 300 Tubes , Repeated Ring Test 151 To 300 Tubes , Individual Tube Testing 151 To 300 Tubes , 301 To 600 Tubes For Pipes Heat Exchanger Revisioning And Testing , Rtj Flange 301 To 600 Tubes , For Channel Box Opening And Box Up 301 To 600 Tubes , Bundle Pulling And Insertion 301 To 600 Tubes , Bundle Cleaning From Inside, Outside Shell Cleaning 301 To 600 Tubes , 301 To 600 Tubes Ring Test. , Floating Head Test For 301 To 600 Tubes , Cover Test For 301 To 600 Tubes , Repeated Ring Test For 301 To 600 Tubes , Individual Tube Testing For 301 To 600 Tubes , Heat Exchanger Revisioning Testing Single Unit Having 601 To 900 Tubes For Pipes , Rtj Flange For 601 To 900 Tubes , Channel Box Opening Box Up For 601 To 900 Tubes , Removal Installation Fixing Of Temperature Transmitter , Removal Of Temp. Gauge Temp. Switch Thermocouple Rtd With Out Thermowell , Receiving Shifting Of Thermowell With Its Accessories Fromstore Any Other Place Inside Refinery Transport To Work Site , Installation Of I P, P I, E I, F I Convertor , Removal Of I P, P I, E I, F I Convertor , Installation Of Air Filter Regulator , Fabrication Installation Of Yoke Support , Termination Of Wire Size Above 2.5 Sq. Mm And Up To 4 Sq.mm , Termin. Of Wire Size Up To 2.5 Sq. Mm , All Work Up To Plinth Level 1 Is To 2 Is To 4 , Work Up To Plinth Level 1 Is To 1.5 Is To 3 , Centering And Shuttering , 4 Inch Gi Pipe 100 Mm Nominal Bore Dia Supply Installation Of Gi Pipes , 3 Inch Gi Pipe 80 Mm Nominal Bore Dia Supply Installation Of Gi Pipes , Gi Pipes 2 .5 Inch Gi Pipe 65 Mm Nominal Bore Dia , S I Of 2 Inch Gi Pipe 50 Mm Nominal Bore Dia , Gi Pipes 1.5 Inch Gi Pipe 40 Mm Nominal Bore Dia Supply Installation , 1 Inch Gi Pipe 25 Mm Nominal Bore Dia Supply Installation , Removal Fixing Back Of False Flooring , Earth Excavation Sand Removal For Cable Trench , Sand Filling , Opening And Boxing Up Of Manholes , Steel Scaffloding Materials In Contractor Scope , Strainer Cleaning Of Any Size , Hose Connection And Disconnection Job , Replacement Of Gaskets Of Any Size , Fixing Removal Of Flanges Blind Flanges Of Any Rating Size , Preparatory Jobs For Hot Work , Steam Drum Cleaning Of Boiler , Mud Drum Steam Drum Cleaning Of Boiler , Painting Of Road Surface , Carriage Of Oily Sludge, Bio Sludge, Fecal Sludge, Etp Sludge Etc. , Manpower For Additional Job , Earthing With 50 X 6 Mm Gi Strip , Salt And Charcoal For Pipe Earthing , Earth Resistance Measurement
Documents
Unlock the opportunities
Buy This Document-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1000000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane