- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of Indian Institute Of Information Technology And Management
- >
NTID 42101633
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Setting Up Of Di in Thiruvananthapuram - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Setting Up Of Di" in Thiruvananthapuram, India.
Indian Institute Of Information Technology And Management
Thiruvananthapuram, Kerala, India
NTID 42101633
- Opening Date : Wed 3rd December, 2025
- Closing Date : Tue 2nd December, 2025
- ₹ 2021327954.00
- NTID 42101633
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
500000.00 -
Document Cost
17700.00 -
Estimated Cost
2021327954.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date Corrigendum | Date |
| 2 | Corrigendum 2 | Financial Bid |
| 3 | Prebidcorrigendum6 | Technical Bid |
| 4 | Date Corrigendum new 2 | Date |
| 5 | Corrigendum 2 | Financial Bid |
| 6 | Corrigendum 7 | Technical Bid |
BOQ Items Total Items : 1057 | Total Qty : 5555199.825
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Laying and Jointing PVC Pipe. Heading OD68729/2025-2026 Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-35 of specified diameter and length below pile cap as per structural drawing, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic piling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tube well boring machine shall not be used. 800 mm dia piles | 1755.000 | metre |
| 2 | OD68742/2025-2026 Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-35 of specified diameter and length below pile cap as per structural drawing, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic piling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tube well boring machine shall not be used 1000 mm dia piles | 2730.000 | metre |
| 3 | OD68741/2025-2026 Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-35 of specified diameter and length below pile cap as per structural drawing, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic piling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tube well boring machine shall not be used 1200 mm dia piles | 3354.000 | metre |
| 4 | OD4215/2023-2024 Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in Charge.<br>Single pile above 150 tonne and upto 200 tonne safe capacity<br>Initial test (Test Load 2.5 times the Safe capacity) | 1.000 | per test |
| 5 | OD4224/2023-2024 Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in Charge.<br>Single pile above 150 tonne and upto 200 tonne Safe capacity<br><br>Routine test (Test Load 1.5 times the Safe capacity)<br>Routine test (0.5% of total No. of piles) | 1.000 | per test |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054