- Home
- >
- Tender
- >
- Punjab Tender
- >
- Department of BHAKRA BEAS MANAGEMENT BOARD
- >
NTID 41596872
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Replacement Of W in Nangal - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Replacement Of W" in Nangal, India.
- Opening Date : Fri 19th December, 2025
- Closing Date : Thu 18th December, 2025
- ₹ 722861.00
- NTID 41596872
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Corrigendum-I | Date |
| 2 | Corrigendum-II | Date |
| 3 | Corrigendum-III | Date |
| 4 | Corrigendum-IV | Date |
BOQ Items Total Items : 5 | Total Qty : 3351.8
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Replacement of old and deteriorated wooden sleeper with Broad Gauge Monoblock Pre-stressed Concrete sleepers complete in all respects including dismantling and removing the residue/ deteriorated wooden sleeper, removal of ballast/ soil/ formation up to nine feet across the track to accommodate new departmental PRC Sleeper and inserting in track the PRC Sleepers lying along the cess/ formation/slope/toe with all departmental fitting to specified gauge with contractor's tools including one packing to make track fit for 20 Kmph speed and dressing of ballast complete for casual sleeper renewal as directed by Engineer-in-Charge. | 340 | Nos |
| 2 | Shallow screening of track ballast up to the base of the sleeper by manual labour including removal of ballast/soil/formation up to the base of the sleeper 10 feet across the track, to recover the clean ballast by screening on wire mesh, making up the clean cushion up to top level of the sleeper by spreading extra ballast (Departmental supply), packing/ Compaction of ballast, unwanted material i.e. muck, soil to be disposed up to a distance of 7.5 meter from track with contractor's labour and tools complete as directed by Engineer-in-Charge. | 1000 | Meters |
| 3 | Unloading PRC Sleeper from Flat Rail Car and stacking on cess near rail track | 340 | Nos |
| 4 | Earth work excavation in ordinary soil, exclusive of compensation of earth Kassi work undressed involving an average horizontal throw up to 2.0 meters and an average vertical lift up to 0.5 meters including breaking of clods. (6.2 (a ) | 835.90 | cum |
| 5 | Carriage of Earth, Surkhi, Sand, Earth Fly, Ash, Bajri, Ballast, Stone boulders, Kankar and Building Rubbish. Earth upto 3 km. (5.02 (i) (a) | 835.90 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054