NTID 42733419
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Replacement Of R in Mumbai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Replacement Of R" in Mumbai, India.
University of Mumbai
Mumbai, Maharashtra, India
NTID 42733419
- Opening Date : Fri 28th November, 2025
- Closing Date : Wed 26th November, 2025
- ₹ 2434410.00
- NTID 42733419
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
24400.00 -
Document Cost
590.00 -
Estimated Cost
2434410.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date extension | Date |
BOQ Items Total Items : 11 | Total Qty : 14529.92
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Removing G.I. orA.C. sheet roofing includingpurlins, principal rafters etc. including sortingserviceable and unserviceable materials, stacking the same as and where directed in the compound including scaffolding etc. complete. | 1702.31 | One Square Metre |
| 2 | Providing and fixing corrugated galvanised iron sheets of 0.63mm thick (24 B.W.G.) for roofingwithoutwindtiles includingfasteningwithgalvanisedironscrews and bolts, lead and bitumenwashers as per drawing etc. complete.(Weight of 5.5 Kilogram/sq.m.). | 1702.31 | One Square Metre |
| 3 | Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. Note : Following items to be executed after prior approval of Superintending Engineer. | 89.76 | Square Metre |
| 4 | Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. | 89.76 | One Square Metre |
| 5 | Removing any kind of debris including loading in truck and conveying to dumping point approved by MCGM, unloading, spreading etc. complete. (SSR Transportation page no.362) (Note: rate to be reduced proportionally, if lead is within 50 km). | 10 | Cubic metre |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054