- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED
- >
NTID 44154765
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Renovation Of Bo in Balarampur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Renovation Of Bo" in Balarampur, India.
WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED
Balarampur, West Bengal, India
NTID 44154765
- Opening Date : Wed 18th March, 2026
- Closing Date : Mon 16th March, 2026
- ₹ 1541658.00
- NTID 44154765
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
30833.00 -
Document Cost
Refer Documents -
Estimated Cost
1541658.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Extension of time | Date |
BOQ Items Total Items : 44 | Total Qty : 10448.93
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleaned). | 1000.00 | Sqm |
| 2 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.a) In ground floor including roof. | 31.00 | Cum |
| 3 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m.In ground floor including roof. upto 150 mm. thick | 2.00 | Cum |
| 4 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. | 4.00 | Cum |
| 5 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. | 150.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054