- Home
- >
- Tender
- >
- Assam Tender
- >
- Department of Military Engineer Services
- >
NTID 43975946
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Provn Of New Liv in Kamrup - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Provn Of New Liv" in Kamrup, India.
- Opening Date : Thu 12th March, 2026
- Closing Date : Tue 10th March, 2026
- ₹ 4320000.00
- NTID 43975946
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
86400.00 -
Document Cost
500.00 -
Estimated Cost
4320000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum |
| 2 | BOQ REVISE | BOQ |
BOQ Items Total Items : 105 | Total Qty : 11779.77
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Surface dressing n exc 15 cm deep and getting out in soft/loose soil, complete all as per specified and as directed by Engineer-in-charge. | 248.46 | SQM |
| 2 | Excavation in trenches n.exc 1.5m wide and n.exc 1.5 m in depth for foundation etc or for shafts, wells, cesspits, manholes, pier holes etc. and getting out in soft/loose soil complete all as per specified and as directed by Engineer-in-charge. | 96.92 | CUM |
| 3 | Excavation in post holes (or similar holes) each n.exc 0.5cum in soft/loose soil and getting out, returning filling in and ramming earth or broken rubble mixed with earth around in layers not exceeding 25cm, watering and removing of surplus soil to a distance n.exc 50 meters and making good surface, complete all as per specified and as directed by Engineer-in-charge. | 20.00 | EACH |
| 4 | Returning, filling in, including spreading, leveling, watering and well ramming in layers n exc 25cm complete all as per specified and as directed by Engineer-in-charge. | 53.72 | CUM |
| 5 | Removing excavated material not exc. 50 m & depositing where directed at a level not exc. 1.5 m above starting point complete all as per specified and as directed by Engineer-in-charge. | 43.50 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054