- Home
- >
- Tender
- >
- Rajasthan Tender
- >
- Department of Nuclear Fuel Complex
- >
NTID 44939417
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowCorrigendum Preventive Maint in Chittorgarh - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Preventive Maint" in Chittorgarh, India.
Nuclear Fuel Complex
Chittorgarh, Rajasthan, India
NTID 44939417
- Opening Date : Wed 20th May, 2026
- Closing Date : Tue 19th May, 2026
- ₹ 14269000.00
- NTID 44939417
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
285378.00 -
Document Cost
Refer Documents -
Estimated Cost
14269000.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Date Extension Corrigendum | Date |
BOQ Items Total Items : 18 | Total Qty : 2344
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Preventive Maintenance(PM) of Centrifugal Blowers : Frequency : Quarterly (once in 3 months) PM works involves tbe following: a) Ensure Drive V-Belts tension (if reqd, adjust motor) b) Replace damaged V-belts c) Ensure coupling in good condition (if reqd, replace) d) Grease the Brearings e) Ensure Flexible joints in good condition (if reqd, replace) f) Ensure Belt guard in good position (if reqd, reset) g) Grease Damper bearings h) Ensure all fasteners are in complete fastened conditon (if reqd, fasten) i) Ensure the actuator connections in order (if reqd, refix) j) Report, if any abnormality in functioning Note : PM shall be performed for installed 184 qty per quater. | ||
| 2 | Blowers upto 55 KW capacity | 480 | Nos |
| 3 | Blowers from 56 KW to 350 KW capacity | 256 | Nos |
| 4 | Preventive Maintenance(PM) of Horizontal coupled Centrifugal Pumps : Frequency : Quarterly (once in 3 months) PM works involves tbe following: a) Makeup oil in bearing chamber b) Ensure coupling in good condition (if reqd, replace) c) Ensure coupling guard in position (if reqd, adjust & fasten) d) Ensure NO water leakage (if reqd, rectify) e) Remove Strainer clean & re-fit f) Ensure all Nut Bolts are fastened (if reqd, fasten) g) Drain hydrocyclone till sediment is bleeded out h) Report if any abnormality is observed Note : PM shall be performed for installed 32 qty per quater. | ||
| 5 | Pumps upto 20 KW capacity | 108 | Nos |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054