Inquiry NowCorrigendum Phase-i Intercon in Salcete - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Corrigendum Phase-i Intercon" in Salcete, India.
- Opening Date : Fri 17th April, 2026
- Closing Date : Thu 16th April, 2026
- ₹ 30264343.00
- NTID 44668614
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
605287.00 -
Document Cost
20000.00 -
Estimated Cost
30264343.00
Latest Corrigendum List
| # | Corrigendum Title | Corrigendum Type |
|---|---|---|
| 1 | Corrigendum | Date |
BOQ Items Total Items : 106 | Total Qty : 59895.74
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches, drain not exceeding 1.5m in width 10 sq.m on plan including dressing of sides ramming of bottoms for all lead and lift including setting out the excavated soil & disposal of surplus soil with all lead including providing barricading danger lighting guarding as directed by departmental officer in all types strata comprising any of the materials such as soil, silt sand clay gravel moorum of all conglomerated laterite rock, soft rock fissured shattered decomposed rock or weathered rock and all such other materials as described under Appendix A to these specification either in full or in parts as the case may be adopting any approved method of methods as may be convenient or permitted inclusive of chiselling, wedging etc, blasting probhibited in all conglomerates as directed by the Engineer-incharge etc, complete. | 12577.96 | Cum |
| 2 | Refilling the pipeline/foundation trenches plinth sides foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 12407.26 | Cu.m |
| 3 | Repairs and reinstatement to the road for trenches made by laying water supply pipeline, by removing the refilled material in the trench for the total depth of 0.40m and making good the road surface by providing laying rolling by road roller compacting for laterite soling 30cm thick, two layer of full grout of 50mm thick each as per specifications mentioned in item no 14086 of road GSR, complete as per the direction of the engineer in charge. | ||
| 4 | Rural road. | 2507.00 | Sq.m |
| 5 | Cutting the bituminous road for laying the pipeline in trenches for a width of 0.6m including labour, tools, etc. and disposing the excavated excess material from the trench to a distance of 1000 metres, including making level the trench surface by utilising the serviceable material to the level of the top surface of road, by compacting, watering ramming with rolling with road roller after completion of laying of pipe and refilling the trenches etc. complete as per the direction of engineer in charge. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054